Purva Northern Lights Phase 3
Purva Northern Lights Phase 3 is a mixed-use township by Puravankara Limited that is located in KIADB Aerospace Park, North Bangalore. The Phase 3 spans over 6.2 acres. There are 270 luxury apartments in Phase 3, and there are 2 towers. Each tower has B+G+30 upper floors. The launch date of the Phase 3 is on 15 April 2027. The possession date of the project is 31 December 2031.
Location
Purva Northern Lights Phase 3 location is in KIADB Aerospace Park, Bagalur Village, North Bangalore, Karnataka – 562149. The Latitude of the project is 13.148889231584995, and the Longitude of the project is 77.0108652934432.
The location advantages of the project are
- Easy access to Bellary Road (NH 44)
- 18* to 20* mins to Kempegowda International Airport
- Close to Yelahanka & Hebbal business districts
Master Plan
Purva Northern Lights Phase 3 master plan is thoughtfully planned over 6.2 acres, of which 3.8 acres are allocated for open space. The project construction is planned over 2.4 acres of land. The total plinth area is over 2.4 acres of land. The height of each tower is 98.95 meters.
The master plan is inspired by Bali’s terraced landscapes. The project is designed so that:
- Homes receive natural light and ventilation
- Residents experience a calm and balanced lifestyle
- Nature flows through the community
- Landscaped terraces create visual openness
Floor Plan
Purva Northern Lights Phase 3 floor plan is a blueprint of the housing units of the project in 2, 3, and 4 BHK sizes. The size of each unit is as follows,
| Unit | Size |
| 2 BHK Flat | 1010 to 1220 sq. ft |
| 3 BHKFlat | 1500 to 1800 sq. ft |
| 4 BHKFlat | 2100 to 2400 sq. ft |
Price
Purva Northern Lights Phase 3 starts from Rs 1.3 Crores for a 2 BHK flat, and the price goes up to Rs 2.64 Crores for a 4BHK flat.
The price list of Phase 3 is as follows,
- 2 BHK flat - ₹1.3 to ₹1.4 Cr
- 3 BHK flat - ₹1.8 to ₹2.1 Cr
- 4 BHK flat - ₹2.2 to ₹2.64 Cr
Amenities
Purva Northern Lights Phase 3 includes 80+ Lifestyle Experiences, which makes Northern Lights different.
The project has 2 clubhouses that include
- ~75,000 sq ft Grand Clubhouse
- ~25,000 sq ft Poolside Clubhouse
The amenities inside the clubhouse include
- Swimming Pool
- Kids Pool
- Sky Cinema
- Pantry
- Table tennis (2 Nos)
- Indoor games room
- Water feature atrium
- Lounge
- Creche
- Billiards (2 Nos)
- Kids play zone
- Cafeteria / Reading lounge
- Badminton Court (4 Nos)
- Squash Court
- Bowling Alley
- Indoor Heated Pool
- Billiards (3 Nos)
- Table Tennis (3 Nos)
- Pool Deck
- Karaoke / Music room
- Dance studio
- Party deck
- Business Centre / Co-working space
- Kitchen
- Party hall (2 Nos) + Pre-function
- Art studio
- Learning centre
- Hobby room (2 Nos)
- Cross-fit training / TRX room
- Meditation / Yoga room
- Guest room (8 Nos)
- Spinning studio
- Spa (His & Hers)
- Association room
- Cards room
Specification
Purva Northern Lights Phase 3 specifications show the list of materials that are used in building the project. A detailed specifications PDF is available for download.
Reviews
Purva Northern Lights Phase 3 reviews are mostly positive, which shows that buyers are happy with the prime location and reasonable price range with luxury lifestyle choices. As modern designs are added to the project, buyers are very much attracted to the project.
RERA
Purva Northern Lights Phase 3 RERA Approval was obtained on March 12, 2026. Purva Northern Lights Phase 3 RERA number is PRM/KA/RERA/1251/309/PR/120326/008525. The Acknowledgement number is ACK/KA/RERA/1251/309/PR/110326/010093.
Brochure
Purva Northern Lights Phase 3 brochure shows all the exclusive details of the project, which includes floor plan, specifications, master plan, builder details and a list of amenities. Purva Northern Lights Phase 3 brochure PDF is available for download.
Frequently Asked Questions
- When is possession of Purva Northern Lights Phase 33?
The possession of the project is on 31 December 2031.
- How many flats are there in Phase 3?
There are 270 units in Phase 3.
- How many towers are there in Phase 3?
There are 2 towers in phase 3.