Scale: 24.55 Acres Across 3 Phases
Purva Northern Lights covers 24.55 acres in 3 phases. Phase 1 spans 9.5 acres with 1,225 flats across 3 towers. Phase 2 covers 8.77 acres with 1,208 flats. Phase 3 covers 6.29 acres with 540 premium 2 & 3 BHK flats.
No other residential township launched on Bagalur Road in 2026 comes close to this land area. Scale matters in a township because it determines how much space you get per resident. At 24.55 acres for 2,973 flats, this township gives you roughly 358 sq. ft. of land per flat — before adding any floor area.
Open Space: 80% of 24.55 Acres Stays Green
The project uses only 20% of its land for buildings. The RERA filing for Phase 1 confirms a built footprint of 12,231 sq. metres against an open area of 26,314 sq. metres. Parks alone cover 9,032 sq. metres in Phase 1.
Most townships in North Bangalore build on 50 to 60% of their land to maximise unit count. Purva Northern Lights takes the opposite approach. The result is wide gaps between towers, better airflow on all floors, and clear views from balconies even on the lower floors.
Amenities: RERA-Verified Areas
The amenity claims here are not just marketing numbers. Karnataka RERA filings confirm these exact areas for Phase 1:
| Amenity |
RERA-Verified Area |
| Club House |
9,696 sq. m. |
| Gymnasium |
8,696 sq. m. |
| Indoor Sports Facility |
9,696 sq. m. |
| Swimming Pool |
2,874 sq. m. |
| Outdoor Sports Facility |
3,100 sq. m. |
| Parks |
9,032 sq. m. |
| Water and Sanitation Facilities |
4,790 sq. m. |
The two clubhouses together cover 1 lakh sq. ft. The main clubhouse is 75,000 sq. ft. and the second is 25,000 sq. ft. A 76,000 sq. ft. retail plaza sits inside the township for daily needs.
Construction: ₹859 Crore Phase 1 Commitment
The total certified project cost for Phase 1 is ₹859 crores. This figure is filed with Karnataka RERA and signed off by the project's chartered accountant. It includes ₹98.37 crores for land and ₹760.79 crores for construction.
Kalpataru Projects International is the appointed contractor. Construction started on 15 April 2026. The RERA filed schedule runs through to 31 December 2029. Sub-structure work completes by November 2027. Super-structure, finishing, and landscaping run from 2027 to December 2029.