Purva Northern Lights Phase 2 Project Schedule
The Purva Northern Lights Phase 2 project schedule is planned in a timeline from 5 October 2026 to 31 December 2030. It is scheduled for completion in 4 years, with possession starting from 31 December 2030. The development starts with site preparation and earthwork, followed by foundation and sub-structure work until March 2027.
The main construction phase, including RCC structure and masonry work, runs from August 2028 to December 2030. At the same time, finishing work such as plastering, electrical work, and painting takes place from late 2028 to 2030.
The final phase covers elevation, landscaping, and overall site development. This phase includes 9696.0 sq. mt. clubhouse and 9032.0 sq. mt. park space. The entire project is scheduled for possession in December 2030.
Sub-Structure
The sub-structure work in the Purva Northern Lights Phase 2 project is the first stage of construction. It runs from 5 October 2026 to 30 May 2028. This stage builds the base and strength of the building.
The work starts with earthwork and digging the ground across the site. After that, the foundation and plinth work are completed. Then, the team adds sub-structure flooring and builds strong retaining walls to support the structure.
| Project Work | Estimated From Date | Estimated To Date |
| Earth work and other leveling preparation work | 05-10-2026 | 30-03-2027 |
| Foundation footing work | 02-02-2027 | 30-09-2027 |
| Upto Plinth Level | 10-05-2027 | 30-12-2029 |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 02-07-2027 | 30-01-2028 |
| Retaining wall (All types) | 10-05-2027 | 30-05-2028 |
Super-Structure
The Super-Structure Work in Purva Northern Lights Phase 2 is the stage where the building rises above the ground. This phase runs from August 10, 2028, to April 30, 2030.
This stage covers the full building structure, starting from the RCC framework and moving up to the completed outer shell of the homes. It also includes the installation of railings and grills.
| Project Work | Estimated From Date | Estimated To Date |
| RCC or MS Framed structure | 10-08-2028 | 30-05-2029 |
| Masonry Construction | 10-08-2028 | 30-12-2030 |
| Plastering inside , outside & Ceiling | 10-01-2028 | 30-12-2030 |
| Joinery: Doors, Windows, Ventilators etc | 10-01-2028 | 30-05-2030 |
| Basic work of Water supply, Sanitary and Electrification | 20-10-2028 | 30-12-2030 |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 10-05-2028 | 30-08-2030 |
| Railing and Grill fixing | 05-12-2028 | 30-04-2030 |
Finishing Works (Fitting and Fixtures)
The finishing work (fittings and fixtures) in Purva Northern Lights Phase 2 is the final stage of construction. This phase runs from 10 October 2028 to 30 December 2030.
This stage turns the building into a ready-to-use home. It includes interior fittings, electrical and plumbing work, safety systems, and final exterior design.
| Project Work | Estimated From Date | Estimated To Date |
| Electrification, Water supply and Sanitary Finishing | 10-08-2029 | 30-12-2030 |
| Painting | 10-11-2028 | 30-12-2030 |
| Fire prevention, fire fighting fitting and fixture with network | 10-07-2028 | 30-06-2030 |
| Weather Proof work(tile,concrete) | ||
| Wardrobe, Showcase, Kitchen cabinet, Puja work | ||
| Elevation work | 15-12-2029 | 30-12-2030 |
| Internal and External work including landscapes as per sanctioned drawings | 10-06-2029 | 30-12-2030 |
Internal Infrastructure
The internal infrastructure in Purva Northern Lights Phase 2 includes all the basic services needed for daily use. All these systems are fully provided, so the project supports easy and comfortable living. It includes
- Water Supply
- Sewage and Drainage System
- Water conservation/rain water harvesting/recharge of ground water
- Energy management
- Fire protection and fire safety requirements
- Solid waste management and disposal
- Emergency Evacuation services
External Infrastructure
The external infrastructure in Purva Northern Lights Phase 2 includes all the main services across the project area. These systems support the whole community and help the project run in a smooth way. It ensures proper water, power, and waste systems for all residents. It includes
- Water Supply
- Internal Roads & Footpaths
- Sewage and Drainage System
- Electricity supply transformer and substation
- Solid waste management and disposal
- Emergency Evacuation Services
- Storm water drains
- Use of renewable energy
- Water conservation/rain water harvesting/recharge of ground water
- Fire protection and fire safety requirements
- Sewage Treatment Plant (STP)
- Parks & Tree planting
- Street Lighting
Common Areas
The external infrastructure in Purva Northern Lights Phase 2 includes the shared spaces in a residential project that all residents can use.These areas are not owned by a single person but are available for everyone living in the apartment community. It ensures Staircases, Lifts, and Corridor/Lobbies for all residents. It includes
| Project Work | Area (Sq Mt) |
| Staircases | 9979.0 |
| Lifts | 227.0 |
| Corridor/Lobbies | 2852.15 |
| Fire escapes | 65.0 |
| Common entrance and exit for the building/common portico/foyer/verandah | 2852.15 |
| Basement | 38259.0 |
| Terrace | 1249.0 |
| Outer Wall | 0.0 |
| Open parking areas | 206.0 |
| Provision for lodging of management staff and security staff | 0.0 |
| Water conservation and renewable energy | 0.0 |
| Common storage spaces |