Purva Northern Lights Phase 2 Project Schedule


Featured Image of Purva Northern Lights Phase 2 Project Schedule

The Purva Northern Lights Phase 2 project schedule is planned in a timeline from 5 October 2026 to 31 December 2030. It is scheduled for completion in 4 years, with possession starting from 31 December 2030. The development starts with site preparation and earthwork, followed by foundation and sub-structure work until March 2027.

The main construction phase, including RCC structure and masonry work, runs from August 2028 to December 2030. At the same time, finishing work such as plastering, electrical work, and painting takes place from late 2028 to 2030.

The final phase covers elevation, landscaping, and overall site development. This phase includes 9696.0 sq. mt. clubhouse and 9032.0 sq. mt. park space. The entire project is scheduled for possession in December 2030.

Sub-Structure

The sub-structure work in the Purva Northern Lights Phase 2 project is the first stage of construction. It runs from 5 October 2026 to 30 May 2028. This stage builds the base and strength of the building.

The work starts with earthwork and digging the ground across the site. After that, the foundation and plinth work are completed. Then, the team adds sub-structure flooring and builds strong retaining walls to support the structure.

Project Work Estimated From Date Estimated To Date
Earth work and other leveling preparation work 05-10-2026 30-03-2027
Foundation footing work 02-02-2027 30-09-2027
Upto Plinth Level 10-05-2027 30-12-2029
Sub-structure flooring (Parking Floor, more than one floor below general ground level) 02-07-2027 30-01-2028
Retaining wall (All types) 10-05-2027 30-05-2028

Super-Structure

The Super-Structure Work in Purva Northern Lights Phase 2 is the stage where the building rises above the ground. This phase runs from August 10, 2028, to April 30, 2030.

This stage covers the full building structure, starting from the RCC framework and moving up to the completed outer shell of the homes. It also includes the installation of railings and grills.

Project Work Estimated From Date Estimated To Date
RCC or MS Framed structure 10-08-2028 30-05-2029
Masonry Construction 10-08-2028 30-12-2030
Plastering inside , outside & Ceiling 10-01-2028 30-12-2030
Joinery: Doors, Windows, Ventilators etc 10-01-2028 30-05-2030
Basic work of Water supply, Sanitary and Electrification 20-10-2028 30-12-2030
Dadoing, Skirting, Flooring, Tiles work (All types) 10-05-2028 30-08-2030
Railing and Grill fixing 05-12-2028 30-04-2030

Finishing Works (Fitting and Fixtures)

The finishing work (fittings and fixtures) in Purva Northern Lights Phase 2 is the final stage of construction. This phase runs from 10 October 2028 to 30 December 2030.

This stage turns the building into a ready-to-use home. It includes interior fittings, electrical and plumbing work, safety systems, and final exterior design.

Project Work Estimated From Date Estimated To Date
Electrification, Water supply and Sanitary Finishing 10-08-2029 30-12-2030
Painting 10-11-2028 30-12-2030
Fire prevention, fire fighting fitting and fixture with network 10-07-2028 30-06-2030
Weather Proof work(tile,concrete)
Wardrobe, Showcase, Kitchen cabinet, Puja work
Elevation work 15-12-2029 30-12-2030
Internal and External work including landscapes as per sanctioned drawings 10-06-2029 30-12-2030

Internal Infrastructure

The internal infrastructure in Purva Northern Lights Phase 2 includes all the basic services needed for daily use. All these systems are fully provided, so the project supports easy and comfortable living. It includes

  • Water Supply
  • Sewage and Drainage System
  • Water conservation/rain water harvesting/recharge of ground water
  • Energy management
  • Fire protection and fire safety requirements
  • Solid waste management and disposal
  • Emergency Evacuation services

External Infrastructure

The external infrastructure in Purva Northern Lights Phase 2 includes all the main services across the project area. These systems support the whole community and help the project run in a smooth way. It ensures proper water, power, and waste systems for all residents. It includes

  • Water Supply
  • Internal Roads & Footpaths
  • Sewage and Drainage System
  • Electricity supply transformer and substation
  • Solid waste management and disposal
  • Emergency Evacuation Services
  • Storm water drains
  • Use of renewable energy
  • Water conservation/rain water harvesting/recharge of ground water
  • Fire protection and fire safety requirements
  • Sewage Treatment Plant (STP)
  • Parks & Tree planting
  • Street Lighting

Common Areas

The external infrastructure in Purva Northern Lights Phase 2 includes the shared spaces in a residential project that all residents can use.These areas are not owned by a single person but are available for everyone living in the apartment community. It ensures Staircases, Lifts, and Corridor/Lobbies for all residents. It includes

Project Work Area (Sq Mt)
Staircases 9979.0
Lifts 227.0
Corridor/Lobbies 2852.15
Fire escapes 65.0
Common entrance and exit for the building/common portico/foyer/verandah 2852.15
Basement 38259.0
Terrace 1249.0
Outer Wall 0.0
Open parking areas 206.0
Provision for lodging of management staff and security staff 0.0
Water conservation and renewable energy 0.0
Common storage spaces